Space Information
The exterior design adopted changes in elevation pattern that took into account a three-type combination of modular and factory production, in order to create a unique elevation design that can transcend the limitations of modular architecture, which are, in general, simply repeated and standardized. The lobby accentuated the frontality and a sense of being open by installing curtain walls for the entire front elevation, and it was designed as an interior space with an open, cheerful, and jaunty atmosphere, serving as a space for the construction startup companies to move in.
In the process beforehand the design phase, the project proceeded with close cooperation with the constructor and manufacturer. Starting with the full application of BIM design, the entire process was finished by applying smart construction technologies such as a VR digital mock-up using BIM data and quality/process control through drones and laser scanning.
Smart Construction Support Center 2
Related Contents