• KOR
  • ENG
Smart Construction Support Center 2 Located at the Korea Institute of Civil Engineering and Building Technology in Goyang-si, Gyeonggi-do, Smart Construction Support Center 2 was commissioned as the first domestic smart turnkey project where the modular architectural method and smart construction technologies are applied in full measure. Once it was determined that it met the requirements as a project to proceed to the construction document phase in 2021, the design and building permit processes took about four months to complete. After the construction started, it took ten and a half months to finish.

The three-story Smart Construction Support Center 2, with a total floor area of 1,817㎡, uses the basic module of 3m x 6m. Each architectural, structural, and building equipment component was manufactured in a special factory that was exclusively used to produce the modular for three months, in addition to two weeks for transport and installation. It was made up of a total of sixty-nine 3D box-shaped modules, each of three different types. This effort was to minimize on-site construction and maximize factory production.
  • main_01.png
  • main_02.png
  • main_03.png

Space Information

  • 1,817Square meters
    floor areas
  • +3Three stories
  • 2022Project
    Completion

The exterior design adopted changes in elevation pattern that took into account a three-type combination of modular and factory production, in order to create a unique elevation design that can transcend the limitations of modular architecture, which are, in general, simply repeated and standardized. The lobby accentuated the frontality and a sense of being open by installing curtain walls for the entire front elevation, and it was designed as an interior space with an open, cheerful, and jaunty atmosphere, serving as a space for the construction startup companies to move in.
In the process beforehand the design phase, the project proceeded with close cooperation with the constructor and manufacturer. Starting with the full application of BIM design, the entire process was finished by applying smart construction technologies such as a VR digital mock-up using BIM data and quality/process control through drones and laser scanning.

Keywords
detail_02.png
detail_03.png

Smart Construction Support Center 2

  • Location Ilsanseo-gu, Goyang-si, Gyeonggi-do
  • Program Modular
  • Area 1,817m²
  • Floors 3 Stories
  • Year 2022
  • Awards BIM Awards, 2022
detail_04.png

제보하기 (Report Misconduct)

임직원의 직무윤리와 관련된 부정, 비리를 제보하는 곳입니다.

제보내용은 비공개로 접수, 처리되며 제보자의 신분은 철저하게 보호됩니다.
제보내용이 사실에 근거하지 않거나 자료가 불확실한 경우 처리되지 않을수 있으니
정확한 사실확인을 위해 가능한 구체적으로 작성하여 주시길 바랍니다.

  • TEL02-2184-5050
  • FAX02-2184-5977
  • EMAILethics_samoo@samoo.com
  • 우편/방문서울특별시 강동구 천호대로 1077 이스트센트럴타워 05340, 삼우종합건축사사무소 감사팀

※ 임금 및 기성체불 등 협력업체 관련 민원은 02-2184-5114로 문의바랍니다.

*필수 입력 사항입니다.

개인정보 활용동의

(주)삼우종합건축사사무소는 ‘제보하기’의 의견 접수와 관련하여 필요한 최소한의 개인정보를 수집하고 있습니다.

  • 수집 항목 : 이름, 연락처, 이메일
  • 수집·이용목적 : 본 제보의 사실 관계 확인 및 처리 내용 안내
  • 보유·이용 기간 : 목적달성시까지

위 사항에 동의하십니까?
개인정보 활용 동의를 거부할 권리가 있으며, 동의를 거부할 경우 제보하기 이용이 제한됩니다.